RFQ #2841 Auto-Priced
    Al Maha Steel LLC

    1,240 m² Roof PIR 100mm

    L/200 Span CheckPassed ✓
    Gross Margin28.4%
    Costed QuoteOMR 48,200
    Bay B InventoryLine #2 Allocated
    Coil #H-4821

    PPGI 0.50mm · Off-White RAL 9002

    Reserved Coil Weight24.8 T (78%)
    Manufacturing ERP · Built for steel & panel plants

    Run the whole factory on one platform.

    ZEMAS connects enquiry, quotation, engineering, production, inventory, quality and dispatch — so every ton leaving your plant is planned, priced and proven.

    ISO-ready quality records Multi-plant & multi-currency Role-based approvals
    Roll-Forming Line #2 Live Shift A
    Shift Target: 1,200 m²

    Speed: 18.5 m/min · 0 Scrap Wastage

    Batch Output840 m² (70%)
    Gate Pass #D-2841ISO 9001 Pass
    Truck #OM-4819

    56.6 Tons Dispatched · OTIF 99.2%

    Skin Thickness & Paint Film Pass
    Delivery Note & VAT Invoice Attached
    ZEMAS ERP dashboard showing the enquiry to dispatch workflow Quotation approved Material available Dispatch ready
    0%Faster quote turnaround
    -0%Less coil wastage
    0%On-time dispatch
    0Integrated modules
    THE ERP WORKFLOW STACK

    End-to-end pipeline, zero data handoffs

    Click any stage to explore how each phase flows into the next — from first customer enquiry to final dispatch.

    Auto-Advancing Pipeline (Hover to inspect)
    CUSTOMER ENQUIRY & COSTING ENGINE

    From Enquiry to Costed Quote in Minutes

    Capture customer architectural drawings and specs. Zemas automatically derives panel geometry, coil weights, skin gauge, and flashing accessories straight from RFQ data.

    • Automated Sandwich Panel & PEB geometry calculations
    • Auto-derivation of ridge caps, drip trims & fasteners
    • Live gross margin protection before quote release
    4xFaster Quote Generation
    Zemas ERP — Enquiry & Costing
    New RFQ #2841Auto-Calculating...
    Panel TypeThicknessArea m²Weight (T)
    Roof PIR100mm1,24032.6
    Wall PUR75mm64014.2
    Cold Room120mm3209.8
    Interactive ROI Estimator

    Estimate your plant's quarterly savings

    Adjust your monthly production tonnage to see estimated quotation hours saved and scrap recovery with Zemas ERP.

    800 Tons / mo
    200 Tons (Single Line)2,000 Tons4,000+ Tons (Multi-Plant)

    Primary Manufacturing Output:

    Calculations derived from live GCC plant performance data (Muscat & UAE deployments).
    Projected Monthly Efficiency

    Estimated Plant Return

    57 hrsEstimating time saved / month
    22.4 TCoil wastage scrap eliminated
    OMR 7,970Estimated monthly cost savings
    99.2%Target on-time delivery SLA
    Request Custom Plant ROI Assessment
    Platform capabilities

    Engineered for manufacturing reality

    Not a generic ERP with a factory add-on. ZEMAS ships with the calculations, rules and controls a metal fabrication business runs on.

    Engineering span rules

    Validate panel spans, thickness and load conditions automatically before a quote is ever released.

    Span checksProfile libraryFlashings

    Multi-currency & taxation

    Quote in any currency with live conversion, region-aware VAT/GST rules and compliant tax documents.

    FX ratesVAT / GSTWithholding

    Production automation

    Roll-forming schedules, work orders and machine loading generated straight from confirmed orders.

    Work ordersSchedulingShop floor

    Steel & coil intelligence

    Track coils by weight, gauge and colour with real-time reservation against each production batch.

    Coil trackingWastageReservations

    Multi-tier approvals

    Configurable approval matrices for discounts, purchase orders and dispatch — with a full audit trail.

    Audit trailRolesLimits

    Live executive analytics

    Order book, margin per ton, on-time dispatch and plant utilisation on one enterprise dashboard.

    Margin/tonOTIFUtilisation
    Nine integrated modules

    One licence. Every department.

    Turn modules on as you grow — they share the same records, permissions and reporting layer from day one.

    CRMLeads & enquiries
    SalesQuotes & orders
    ProductionWork orders
    InventoryCoils & stores
    QualityInspections
    PurchasingVendors & POs
    DispatchLogistics
    ReportsBI & exports
    SettingsRoles & rules
    Business value

    Measurable gains in the first quarter

    Teams move from disconnected spreadsheets to a controlled, auditable order pipeline — and the numbers show up on the plant floor.

    Quote 4× faster

    Panel, steel and accessory calculators replace spreadsheets — a full costing sheet in minutes.

    Protect every margin

    Tax, freight and wastage are priced in at source, so approved discounts never erode profit.

    One version of the truth

    Sales, engineering, plant and finance work from the same order record, live.

    Audit-ready by default

    Every approval, revision and inspection is timestamped and exportable for compliance.

    Order #ZM-4821 · Roofing panels248.6 tons · AED · 3 approval tiers
    Span verification0.7mm · 2.1m purlin spacing
    Passed
    Tax & currencyAED · 5% VAT · FX locked
    Applied
    Coil reservationBay B · 4 coils allocated
    Reserved
    Production progress78%
    Excel vs. Zemas ERP

    Why leading plants are retiring spreadsheets

    Every estimation mistake in Excel costs material, margin and delivery time. Zemas eliminates those risks at the source.

    Capability Excel Spreadsheets Zemas ERP
    Accessory Auto-CalculationRidge caps, drip trims, fasteners
    Manual — missing items cause site delays
    100% auto-derived from geometry
    Engineering Span CheckL/200 deflection validation
    Manual lookup tables, error-prone
    Real-time structural safety pass/fail
    Coil AllocationHeat No. & gauge reservation
    No visibility into live warehouse stock
    Real-time coil reservation per batch
    Multi-Currency & VATGCC VAT · India GST
    Formula errors on exchange rates
    Native GCC VAT & multi-currency engine
    Approval WorkflowDiscounts, POs & dispatch limits
    Email chains with no audit trail
    Configurable tiers with full audit log
    Quote GenerationBranded PDF + detailed BOM
    Hours of manual formatting per quote
    One-click branded PDF & BOM release
    Regional compliance

    Built for GCC & India markets

    Native tax engines, multi-currency pricing, and region-specific compliance built into every quote and invoice.

    Tax Regimes Supported

    🇴🇲Oman5% VAT
    🇦🇪UAE5% VAT
    🇮🇳IndiaGST

    Supported Currencies

    OMRAEDINRUSD

    Deployment Options

    Cloud SaaSMulti-tenant, managed hosting · Zero on-site IT required
    On-Premise Plant NetworkOffline-capable · Full data sovereignty · LAN-first architecture
    Frequently asked

    Questions from plant managers

    Common questions from operations directors, estimating leads, and IT teams evaluating Zemas.

    Yes. Our onboarding team maps your existing Excel costing logic — profile libraries, span tables, accessory derivation rules — into Zemas during setup. Most plants are running live estimates within 2–3 weeks of go-live.

    Get started with ZEMAS

    See your own workflow running in ZEMAS

    A 30-minute guided session with our manufacturing consultants, mapped to your products, plant and approval structure.